|本期目录/Table of Contents|

[1]李枝军,肖春平,吴晓超,等.独塔自锚式悬索桥吊杆张拉及其模拟方法[J].南京工业大学学报(自然科学版),2015,37(03):97-102.[doi:10.3969/j.issn.1671-7627.2015.03.018]
 LI Zhijun,XIAO Chunping,WU Xiaochao,et al.Construction procedure and simulation of suspender tension of single-tower self-anchored suspension bridge[J].Journal of NANJING TECH UNIVERSITY(NATURAL SCIENCE EDITION),2015,37(03):97-102.[doi:10.3969/j.issn.1671-7627.2015.03.018]
点击复制

独塔自锚式悬索桥吊杆张拉及其模拟方法()
分享到:

《南京工业大学学报(自然科学版)》[ISSN:1671-7627/CN:32-1670/N]

卷:
37
期数:
2015年03期
页码:
97-102
栏目:
出版日期:
2015-05-30

文章信息/Info

Title:
Construction procedure and simulation of suspender tension of single-tower self-anchored suspension bridge
文章编号:
1671-7627(2015)03-0097-06
作者:
李枝军1肖春平2吴晓超1徐秀丽1李雪红1
1.南京工业大学 土木工程学院,江苏 南京 211800; 2.中国公路工程咨询集团有限公司,北京 100097
Author(s):
LI Zhijun1XIAO Chunping2WU Xiaochao1XU Xiuli1LI Xuehong1
1.College of Civil Engineering,Nanjing Tech University,Nanjing 211800,China; 2.China Highway Engineering Consulting Corporation,Beijing 100097,China
关键词:
桥梁工程 自锚式悬索桥 吊杆张拉 数值模拟 无应力状态
Keywords:
bridge engineering self-anchored suspension bridge suspender tension simulation method no-stress status
分类号:
U448.25
DOI:
10.3969/j.issn.1671-7627.2015.03.018
文献标志码:
A
摘要:
为探索独塔自锚式悬索桥合理、方便的吊杆张拉方法及其数值模拟方法,以潮白河独塔自锚式悬索桥为工程背景,综合利用无应力状态法和交替张拉法的相关理论,提出吊杆张拉的3阶段实施方案。同时,以无应力状态理论为基础,通过将吊杆张拉过程转化为吊杆无应力长度的变化过程,提出分阶段吊杆张拉过程的数值模拟方法。以本文所依托工程为例,采用有限元软件Midas/Civil对整个张拉过程进行数值模拟,给出不同阶段吊杆内力、主梁线形的理论值。通过对比成桥主梁线形和吊杆索力的设计值和实测值,验证了数值模拟的准确性。张拉过程和成桥状态表明,张拉过程的数值模拟结果和实际值吻合较好。
Abstract:
The construction procedure and simulation of suspending cables of the single-tower self-anchored suspension bridge were studied based on a built bridge.A three-stage suspender tension method was proposed.Based on the theory of no-stress status and finite element program MIDAS/Civil,a simulation method for suspending tension was also developed.Firstly,the stress free lengths of suspender cables at different stages were calculated.Then,the tension press was realized by changing the local temperature of cables.The results show that the tension of cables and the shape of the beam calculated by mentioned method were in agreement with the measured values.

参考文献/References:

[1] 李传习,柯红军,姬同庚,等.桃花峪自锚式悬索桥体系装换施工控制研究[C]//中外自锚式悬索桥设计及建造技术论坛.河南:郑州,2013.
[2] 杨继承,卢颖.自锚式悬索桥吊索张拉无应力状态仿真分析方法[J].公路交通技术,2013(3):100-104.
[3] 李盼到,徐艳玲,姜鹏.基于无应力状态法的自锚式悬索桥吊杆张拉方案[J].特种结构,2012,29(3):50-52.
[4] 程俭廷,张俊平,张力文.猎德大桥吊索张拉施工方案分析与优化[J].中外公路,2011,31(6):172-175.
[5] 张哲.混凝土自锚式悬索桥[M].北京:人民交通出版社,2005.
[6] 罗实.自锚式悬索悬索桥索力调整过程研究[D].成都:西南交通大学,2008.
[7] 邱建冬.自锚式索桥吊索张拉优化控制分析[D].重庆:重庆交通大学,2010.
[8] 邢智.自锚式悬索桥施工过程分析和控制参数计算[D].西安:长安大学,2009.
[9] 李建慧,李爱群.空间缆索自锚式悬索桥计算,监控与评估[M].北京:人民交通出版社,2011.

相似文献/References:

[1]徐秀丽,李雪红,刘伟庆,等.大型减隔震桥梁结构分析方法[J].南京工业大学学报(自然科学版),2009,31(01):78.
 XU Xiu-li,LI Xue-hong,LIU Wei-qing,et al.Analysis method for seismic isolated largescale bridge structures[J].Journal of NANJING TECH UNIVERSITY(NATURAL SCIENCE EDITION),2009,31(03):78.

备注/Memo

备注/Memo:
收稿日期:2014-04-25
作者简介:李枝军(1978—),男,山东章丘人,讲师,博士,主要研究方向为大跨桥梁结构健康监测与行车舒适性,E-mail:lizhijun@njtech.edu.cn.
引用本文:李枝军,肖春平,吴晓超,等.独塔自锚式悬索桥吊杆张拉及其模拟方法[J].南京工业大学学报:自然科学版,2015,37(3):97-102..
更新日期/Last Update: 2015-05-20